Updated: February 27, 2009
Tentative Agenda
UNOLS FLEET IMPROVEMENT COMMITTEE MEETING
Moss Landing Marine
Laboratories
March 10-11, 2009
A copy of this agenda can be downloaded as a pdf document at <200903ficag.pdf>
0800 Coffee
and Pastries
0830 Call the Meeting: Dave Hebert, FIC Chair, will call the meeting
to order and provide an opportunity for introductions.
·
Accept the minutes of the October 2008 FIC Meeting
·
Review FIC Action/Task List
0845 Opportunity for Agency Comments
0900 Fleet Improvement Plan – The draft
document <http://www.unols.org/committees/fic/FIP05/document/FIP2009_draft-020609.pdf> has been
provided to the Council for review. Opportunity
for Committee comments.
0915 Fleet Design and Acquisition Efforts – These
reports will focus on vessel design aspects.
During the joint FIC/Council session agency representatives will provide
brief reports on the budget and timelines for these projects.
·
ARRV – Update on design and
acquisition plans - Marc Willis
·
Ocean Class:
o
Acquisition status, vessel
specifications – Tim Schnoor (ONR) / Chris MacDonald (PEOShips)
o
Discussion on UNOLS advisory group membership
·
Regional Class Designs – Review
the NSF Phase I designs for the Regional Class ships - Bob Houtman (NSF)
1015 Mid-morning
Break
1030 SMR Update Project:
·
Status of project
·
Project tasking <http://www.unols.org/committees/fic/smr/update08/index.html>
·
The sections of the draft
Ocean Class Requirements table that require further attention will be
discussed. These sections have been
identified in the FIC review.
·
Discuss next steps and
timeline
1200 Lunch
1300 SMR Update Project – Wrap up morning discussion
1330 Presentation
on the ISS-2000 Integrated Survey System – ISS-2000 is a software package
for surveying that integrates inputs from the sonar systems, dynamic positioning
system, and data acquisition systems, all with a graphic user interface
(GUI). – Pam Clark (JJMA/Alion)
1400 Ocean Observatory Projections -Status report
on Final Design Review and Implementation plans (OOI Office)
1430 Break
1505 Bubble-Sweep down Study and Mitigation for Improved ADCP Data Quality – Dave Hebert
1525 Hugh R. Sharp User Debriefs:
· Review draft set of standard user debrief questions that will evaluate the new technologies of the ship (Jim Bauer)
· Review the Sharp schedule for candidate cruises
· Reduced Fuel Consumption by Improved Directional Stability on Z-Drive Ships – status
· Weatherbird II Improvements
1700 Meeting
Adjourns
Day 2 – Wednesday, March 11th: Moss Landing Marine Laboratories – Seminar Room
0800 Coffee
and Pastries
0830 Call the Meeting: Vernon Asper, UNOLS Chair, will call the
meeting to order and provide an opportunity for introductions.
·
Accept
the minutes of the October 2008 Council Meeting. <http://www.unols.org/meetings/2008/200810cnc/200810cncmi.pdf>
0845 UNOLS 2009 Fleet schedules, estimated
operation costs, and 2010 ship scheduling –
Mike Prince and Stan Winslow
0915 Agency Reports – Budgets and renewal
efforts:
·
NSF – Bob Houtman
-
Budget projections
-
Regional
Class Status
-
ARRV Construction
Status
-
Replacement
Human Occupied Vehicle (RHOV)
·
NOAA - Bill
O’Clock
·
NAVY – Tim
Schnoor
-
Budget
projections
-
Ocean
Class Acquisition Process - Status
0945 Summary of Fleet Improvement Committee
Meeting and Action Items – Dave Hebert
0945 Fleet Improvement Plan – draft document:
·
The draft plan <http://www.unols.org/committees/fic/FIP05/document/FIP2009_draft-020609.pdf>
was provided to the Council prior to the meeting. Discuss steps for finalizing. - Dave Hebert
and Vernon Asper
·
Discussion on issues and strategies for
implementing the Fleet Improvement Plan recommendations on ship renewal.
1030 Break
1045 Interagency Working Group on Facilities – Report on the IWG-F Federal
Facilities and Infrastructure Inventory task and planned IWG-F activities
- Bob Houtman
1105 National
Research Council Studies:
·
Evolution
of the National Oceanographic Research Fleet. - The study is funded by the
Office of Naval Research. The
description and membership can be found at <http://www8.nationalacademies.org/cp/projectview.aspx?key=49014>. The OSB Committee held their first meeting on
January 29th. Vernon Asper, Mike Prince, and Dave Hebert provided a
presentation. – Vernon Asper will report on the meeting.
·
NAS Study on Ocean Infrastructure - Status
1130 Consortium for Ocean Leadership – Report on Ocean Leadership meeting and items of interest to UNOLS. A 2009 UNOLS Goal is to work with Ocean Leadership, the NRC, and the federal agencies to ensure that the fleet is right sized and has the right capabilities for ocean sciences in the coming decades. – Marcia McNutt and Mike Prince
1200 This
concludes the joint meeting of the FIC and Council.