AICC Meeting September 23 & 24, 2003

Appendix 2

USCG Pacific Area Report

 

Click here for PowerPoint (2.6 MB)

Contains pictures of ADCP Installation and HEALY

 

Text of Presentation

 

NEW CONTACT INFO

 

Dave Forcucci 206-217-6648 phone

206-217-6878 Fax

DForcucci@pacnorwest.uscg.mil

Building #3, K Bay

47° 35¹ 23² N

-122° 20¹ 25² W

 

HEALY PERSONNEL

 

Position

Name

Due to Depart

CO

CAPT David Visneski

Summer 2003

XO

CDR Doug Russell

Summer 2003

OPS

CDR Joe Segalla

Summer 2003

EO

LCDR Gregory Stanclik

Summer 2004

MSO

LTJG Mike Woodrum

Summer 2003

MSO

LTJG Neal Amaral

Summer 2005

Lead MST

MSTCS Glenn Hendrickson

Summer 2003

Lead MST

MSTCS Mike Hamerski

Summer 2005

MST1

MST1 Sean Kuhn

Summer 2003

MST2

MST2 Bridget Cullers

Summer 2003

MST2

MST2 Josh Robinson

Summer 2005

MST3

MST3 Suzanne Scriven

Summer 2004

 

CDR Russell has requested to extend one year on HEALY if not picked up for Senior Service School (panel meets week of 9 Sept).

CDR (select) Segalla has indicated that he'd be interested in extending for a third year and fleeting up to the XO job if not selected for 0-5 afloat command (Afloat Command Assignment Panel meets week of 16 Sep). If successful in the CASP, then LCDR Segalla will still compete with others who are successfully screened for available 0-5 command billets (not everyone who screens successfully gets a command that year).

Most enlisted billets will be filled in Dec and Jan.

The Captain assignment panel meets the first week in January.

The Commander assignment panel meets the first week in February.

Operational LCDR orders (OPS in this case) are usually settled in mid-to-late Feb.

HEALY 2003 SCHEDULE

 

6 week NSF SBI Service Cruise

4 week NSF SBI Mooring Maintenance cruise

 

Scheduling Status-

            HEALY is drafting a strawman

 

75 kHz ADCP Installation

March 2002 during emergency dry dock

 

50% NSF Funding (UW purchase of ADCP)

 

50% USCG Funding (Dry dock installation)

            60%- Electronics and cables- ATG

            40%- Transducer well by shipyard

 

SBI successful data collection for both cruises

 

HEALY Science Seawater Sea Chest

 

1)    Target 95% availability rate while operating in sea ice conditions.

2)    Maximize existing down stream plumbing systems lab feeds

(Existing pump and sea chest remain as is for redundancy and open water purposes)

 

15 Nov 02 (completion)

1)    Conduct a survey of other high latitude research vessels and assess applicability to HEALY

2)    Prepare an Analysis of Alternatives with ROM cost estimates for review by the Coast Guard.

 

15 Jan 03 (completion)

1)    Down select to preferred design

2)    Site visits to vessels and component manufacturers

 

15 May 03

1)    Draft specification and cost estimate development

 

01 Aug 03

1)    Final detailed specification and cost estimate

 

High Lattitude Communications

 

 

HEALY Equipment Purchases - 2002

 

 

HEALY Equipment

 

 

HEALY Equipment Purchases - 2003

 

 

HEALY AWS02 Underway Data

 

 

ADCP Underway Data

 

 

HEALY Science Berthing

 

 

AWS02 HEALY Quality of Life