Arctic Icebreaker Coordinating Committee
Town Meeting
19 December 1996
1730-1930 hrs.
Moscone Center, Room 121
San Francisco, CA
Approximately 30 persons attended including AICC members: Jim Swift, Larry
Lawver; Kelly Falkner, Jack Bash and Ken Johnson, UNOLS Chair.
Jim Swift, AICC Chair, opened the meeting with an introduction and followed
with slides 1 through 6. (Appendix
I)
Questions/answers during the presentation are paraphrased below:
- Q: Is HEALY's horsepower 30,000 or 40,000?
- A: 30,000
- Q: What is the primary mission of POLAR STAR/SEA?
- A: Antarctic mission primarily.
- Q: What is cost of using a USCG ship?
- A: Approximately $20,000/day which covers non-USCG expenses. GAO will work
out the final number.
- Q: Will the USCG man HEALY? What about continuity?
- A: The Coast Guard will look into contracting technicians, possibly through
a UNOLS Institution.
- Q: What is building schedule?
- A. HEALY to be delivered in 1998, a year of testing/shakedown. Ready for
ops in 1999.
- Q: Will one vessel be allowed to go into deep Arctic? Will Polar class go
along?
- A: Maybe in the future.
- Q: Will problems with engines on Polar class be fixed in current overhaul?
- A: Engines will have improved reliability. Variable pitch prop will remain.
- Q: What do we do if we want to go into the Arctic Central Basin?
- A: The AICC will help find a way to get a second ship, possibly from the
international community.
Note: The AICC needs to produce a chart of the Arctic where HEALY would feel
comfortable working (area and season).
- Q: Will USCG consider sub-contracting ship ops to UNOLS institution?
- A: Not at this time.
- Q: Are there plans for agencies to draft a MOA to facilitate operations?
- A: In progress
- Q: Will day cost be more than $20,000?
- A: Must be worked out after ops.
- Q: Will HEALY be capable of hard rock sampling/who on the committee to track?
- A: Yes, Larry Lawver.
- Q: How many winches?
- A: Two CTD and Trawl with two drums.
- Q: Have the procedures for a large coring program been thought out?
- A: It is in the science specifications, could be a problem with space for
a 30 meter core.
- Q: How current is the 'Red Book'?
- A: Does not include changes recommended by the AICC.
- Q: What is the weight rating of the side A-frame? It will need 20 tons for
pull-out. What size winch?
- A: Will need to check on that.
- Q: Why not Unistrut on deck, better than 2' center bolt holes?
- A: No comment.
- Q: How will SEABEAM be supported?
- A: Contracted out.
- Q: How will data system infrastructure be supported?: Need to support all
technical functions.
- A: Direct support contracts being considered. Should coordinate with RVTEC.
- Q: Where will HEALY be homeported?
- A: Seattle or Charleston
- Q: Will HEALY return to homeport between cruises?
- A: Depending on the sequence of cruises.
- Q: What is operating profile?
- A: It is in the brochure.
- Q: What computer will be used?
- A: State of the shelf.
- Q: What are the facilities to receive SEABEAM data?
- A: Needs to be addressed.
Comment from Dale Chayes: Need to go out to the community for more technical
support.
- Q: What kind of winch does Polar Class have?
- A: Will need to check.
The meeting adjourned about 1945.